State Swim - East Fremantle
As the head contractor for this renovation project, Distinctive Pools were given an extensive scope of works to give this quality swim school a new lease on life.
All in an amazing 28 day turn-around from closing the doors, to re-opening to the public!
Works included:
- Fully Tiling swimming pool, removing the old painted finish
- Lifting the pool floor by 150mm
- Tiling concourse surrounding pool
- 5 x new on deck showers & tiling to wall
- Tiling works to foyer entrance
- Automatic Water Leveller installation
As the head contractor for this renovation project, Distinctive Pools were given an extensive scope of works to give this quality swim school a new lease on life.
All in an amazing 28 day turn-around from closing the doors, to re-opening to the public!
Works included:
- Fully Tiling swimming pool, removing the old painted finish
- Lifting the pool floor by 150mm
- Tiling concourse surrounding pool
- 5 x new on deck showers & tiling to wall
- Tiling works to foyer entrance
- Automatic Water Leveller installation