Before_A Before_B    
Spa room before being demolished. Spa was built in 1996. Showing spa after room demolished    
       
       
       
       
       
       
       
       
       
0409_A 0409_B    
Start to prepare spa to attach pool - pool to be extended to 11.50m long Determining concrete thickness before attacking with machine    
       
       
       
       
       
       
       
       
       
0415_A 0415_B 0415_C 0415_D

Council approvals have now been received. 12 Tonne excavator with rock breaker removing end of spa for pool to be attached

Excavating deep hole to bury broken concrete and rubble Setting lines to position pool for mark out Marking out pool ready for excavation
0415_E 0415_F 0415_G 0415_H
Removing broken concrete & rubble
Excavation begins
Tidying broken concrete ready for pool attachment
0415_I 0415_J 0415_K 0415_L
Loading truck Trimming pool End of spa broken away with gravel spread End view of spa looking down pool
       
       
       
0416_A 0416_B 0416_C  

Steel form work is started with temporary fence in place

Fitting of MDX main drain Final levelling of drainage gravel
       
       
       
       
       
       
       
0417_A      
Steelwork nearing completion and ready for engineer's inspection.
       
       
       
       
       
       
       
       
       
0421_A 0421_B 0421_C  
Steel fixing & all pre plumbing completed Steel work completed Pool is now ready for concrete placement
       
       
       
       
       
       
       
       
       
0422_A 0422_B 0422_C 0422_D
Concrete being placed and shaped
Showing concrete link up to old spa Showing steps and ledges
0422_E 0422_F    
Concrete shell from spa end Pool showing steps, ledges and spa
       
       
       
       
0425_A 0425 0425_B 0425_C
Pool top being levelled for coping Stone coping being placed
Coping being placed
       
       
       
       
       
       
       
       
       
0501_A 0501_B 0501_D 0501_C
Filtration in place Pipes in place to filtration Pebble being placed with pump Pebble being hand trowelled
0501_E 0501_F    
Protective cover to protect pebble whilst being placed Pebble completed ready for acid wash
       
       
0502_A 0502_B 0502_C  
Pebble being acid washed and light fitted Pool being filled from tanker Pool is ready to add initial chemicals
       
       
       
       
       
       
       
The new Distinctive Pool is now complete...
After_A After_B After_C After_D
Pool with air grid operating Pool complete with fence before paving & landscaping Old spa extended Pool at night with Ceramic Engine LED lights
After_E After_F After_G  
Another night shot Kids enjoying their solar heated pool A VERY HAPPY FAMILY ENJOYING THEIR DISTINCTIVE POOL